Status PHOTOS for December 09

Last updated: December 22, 2009


Latest progress:
Kitchen at A-2 12/22/09 12/22/09 12/22/09 Costa II Model 12/22/09 12/22/09
Boveda Ceiling at C-12 Duplex 12/22/09 12/22/09 12/22/09 12/22/09 Driveway at A-2 12/22/09
Driveway at A-2 12/22/09 Shower 12/22/09 Bedroom door 12/22/09 12/22/09 Shower 12/22/09
Kitchen at A-2 12/22/09 Costa II Model 12/22/09 Costa II Model 12/22/09
Installing Kitchen Cabinets at A-2 12/18/09 Sewage Treatment Plant for A-2 12/18/09 Bathroom Sink 12/18/09 Kitchen Cabinets 12/18/09 Lower Cabinets 12/18/09
Kitchen Bar & Sink 12/18/09 Sewage Treatment Plant Installed 12/18/09 Driveway at A-2 12/18/09 12/18/09 Kitchen counter 12/18/09
12/18/09 12/18/09 12/18/09 Bathroom sink 12/18/09 12/18/09
Costa II model A-3 12/18/09 Costa II Model Kitchen 12/18/09
Costa II model Upstairs 12/18/09 Costa II from the entrance 12/18/09 12/18/09 12/18/09 12/18/09
Construction of Duplex at C-12 12/18/09 12/18/09
12/18/09 12/18/09 12/18/09 Duplex Boveda ceiling 12/18/09 12/18/09
Construction at lot C-12 12/1/09 12/1/09 12/1/09 12/1/09 12/1/09
Construction at lot C-12 12/1/09 12/1/09 12/1/09 12/1/09 12/1/09
Tiling & constructing bathtub in A-2 12/1/09 12/1/09 Terrace at A-2 12/1/09 12/1/09 Stairs at A-2 12/1/09

Home   Previous Page