Status PHOTOS for February 2011

Last updated: February 23,2011


Latest progress:
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/22/11 2/22/11 2/22/11 2/22/11 2/22/11
2/15/11 Installing the windows 2/15/11 2/15/11 2/15/11 Preparing for bathroom sink & granite counter2/15/11
2/15/11 2/15/11 2/15/11 Installing sliding glass doors 2/15/11 Installing marble in bathtub 2/15/11
2/15/11 2/15/11 2/15/11 2/15/11 2/15/11
Gardens in full bloom 2/15/11 2/15/11 Bringing in streets lower parcel 2/15/11
2/10/11 2/10/11 2/10/11 2/10/11 2/10/11
2/10/11 Marble shelves in Kitchen 2/10/11 Guest bath shower with marble 2/10/11 2/10/11 2/10/11
Marble bathtub 2/10/11 2/10/11 2/10/11 2/10/11 2/10/11
2/10/11 Marisol Duplex, Digging the pool 2/10/11 2/10/11 2/10/11 2/10/11
2/10/11
2/7/11 2/7/11 2/7/11 2/7/11 2/7/11
2/7/11 2/7/11 2/7/11 Installing the doors 2/7/11 2/7/11
2/7/11 2/7/11 2/7/11 2/7/11 2/7/11
2/7/11 Finishing the driveway 2/7/11 Front of the Costa II at Lot A-3 2/7/11 Lower Parcel Street 2/7/11 2/7/11
Marisol Duplex Lot C-12 2/7/11 2/7/11 2/7/11 2/7/11 2/7/11