Status PHOTOS for January 2010

Last updated: January 25, 2010


Latest progress:
Model Home Construction at A-3 1/22/10 1/22/10 Making the Cupola 1/22/10 1/22/10 View at Cupola 1/22/10
Construction at A-3 1/22/10 The Miramar I & Costa II homes 1/22/10 1/22/10 1/22/10 1/22/10
Miramar I at Lot A-2 1/22/10 Side View of Miramar 1/22/10 1/22/10 Entrance side 1/22/10 Construction of Duplex at lot C-12 1/22/10
Model Home Construction at A-3 1/6/10 1/6/10 Entrance side of Model Home 1/6/10 1/6/10 Marisol Duplex Construction at Lot C-12 1/6/10
1/6/10 1/6/10 Marisol Duplex 1/6/10
Entrance at A-2 1/2/10 House At A-2 1/2/10 Guest Bath Shower 1/2/10 Bathroom Sink and counter 1/2/10 Side Entrance off the Kitchen 1/2/10
Doorway to the Rooftop Terrace 1/2/10 Master Bedroom 1/2/10 Model home at A-3 Upstairs 1/2/10 1/2/10 Starting the 2nd floor at lot C-12 1/2/10
Construction at C-12 1/2/10 1/2/10 1/2/10 Construction at C-12 1/2/10

Home   Previous Page