Status PHOTOS for January 2010
Last updated: January 25, 2010
Model Home Construction at A-3 1/22/10 |
1/22/10 |
Making the Cupola 1/22/10 |
1/22/10 |
View at Cupola 1/22/10 |
Construction at A-3 1/22/10 |
The Miramar I & Costa II homes 1/22/10 |
1/22/10 |
1/22/10 |
1/22/10 |
Miramar I at Lot A-2 1/22/10 |
Side View of Miramar 1/22/10 |
1/22/10 |
Entrance side 1/22/10 |
Construction of Duplex at lot C-12 1/22/10 |
Model Home Construction at A-3 1/6/10 |
1/6/10 |
Entrance side of Model Home 1/6/10 |
1/6/10 |
Marisol Duplex Construction at Lot C-12 1/6/10 |
1/6/10 |
1/6/10 |
Marisol Duplex 1/6/10 |
||
Entrance at A-2 1/2/10 |
House At A-2 1/2/10 |
Guest Bath Shower 1/2/10 |
Bathroom Sink and counter 1/2/10 |
Side Entrance off the Kitchen 1/2/10 |
Doorway to the Rooftop Terrace 1/2/10 |
Master Bedroom 1/2/10 |
Model home at A-3 Upstairs 1/2/10 |
1/2/10 |
Starting the 2nd floor at lot C-12 1/2/10 |
Construction at C-12 1/2/10 |
1/2/10 |
1/2/10 |
Construction at C-12 1/2/10 |
|