Status PHOTOS for September09

Last updated: September 21, 2009


Latest progress:
Miramar I at Lot A-2 9/20/09 Living room & kitchen 9/20/09 9/20/09 9/20/09 9/20/09
View from Living & Dining area windows 9/20/09 Master bedroom 9/20/09 Master Bedroom 9/20/09 Plumbing for Kitchen sink in the bar/countertop 9/20/09 9/20/09
Pantry under the stairs 9/20/09 Looking up at Calle Hermosa 9/20/09 Calle Hermosa at Lots A-4,A-5,A-6 9/20/09 Construction Calle Hermosa 9/20/09 Calle Hermosa looking down to the Glorieta 9/20/09
9/20/09 Measuring for the Entrance Gates 9/20/09 9/20/09 Costa II Constructiion 9/20/09 Costa II Model Home 9/20/09
Construction Miramar I 9/16/09 Working on the kitchen 9/16/09 9/16/09 9/16/09 9/16/09
Rooftop terrace Miramar I 9/11/09 Construction Miramar I 9/11/09 Construction Costa II Model 9/11/09 9/11/09 9/11/09
Calle Vista Hermosa In Progress 9/11/09 9/11/09 9/11/09 9/11/09 Meditation patio at the waterfall 9/11/09
Construction at Lot A-2 9/4/09 9/4/09 9/4/09 Rooftop Terrace Tile 9/4/09 Working on the rooftop terrace 9/4/09
Construction at Lot A-2 9/4/09 Bathroom construction 9/4/09 Rock Walkway at the waterfall 9/4/09 Waterfall at Vista Encantada 9/4/09 Waterfall 9/4/09
Click Here for Photos & Status from the Start of Vista Encantada!